Water ingress & façade remedial works

Water-ingress investigation and localised façade remedial work carried out by Sky Facade Access Ltd under subcontract at Battersea Reach, London.

Façade remedial detail at Trafalgar House, Battersea Reach
Existing project image: close façade remedial detail.

Project

Location: Battersea Reach, London
Year: 2025
SFA role: Specialist subcontract delivery
Scope: Water-ingress investigation and localised façade remedial work

The task

The package involved difficult-access façade areas associated with a water-ingress problem.

The visible internal symptom alone was not treated as proof of the external entry point. The relevant façade details needed to be accessed closely before the remedial work could be defined and carried out.

What the work required

The work combined close access to the affected façade area with inspection of the visible external detail and localised remedial activity within the instructed scope.

Observations at the façade were considered in the context of the reported leak rather than assuming that the nearest visible joint was automatically the cause.

SFA involvement

Sky Facade Access Ltd carried out the instructed specialist works under subcontract.

The SFA scope related to the agreed water-ingress and remedial package and did not extend to structural assessment, façade design or responsibility for the wider building envelope.

Evidence

SFA project and invoicing records support the company’s involvement in this work.