30 South Colonnade, Canary Wharf
Façade fin & cladding works
High-level façade work carried out by Sky Facade Access Ltd under subcontract at 30 South Colonnade, Canary Wharf.

Project
Location: Canary Wharf, London
Year: 2023
SFA role: Specialist subcontract delivery
Scope: Façade-fin alignment/remedial work and column cladding installation
The task
The package involved high-level façade elements where access, component position and installation sequence had to be considered together.
The work included façade-fin alignment or remedial activity together with defined column-cladding installation tasks within the instructed package.
What the work required
Façade installation at height depends on more than reaching the workface.
The component, working position, sequence and material handling all need to work together so the installation can be carried out without forcing the façade task to fit an unsuitable access method.
SFA involvement
Sky Facade Access Ltd carried out the instructed façade works under subcontract.
SFA’s role related to the defined physical work package and did not include façade-system design, structural engineering, manufacturer approval or responsibility for the wider project.
Evidence
SFA project and invoicing records support the company’s involvement in the work.
The project photograph shows the high-level façade-fin context at 30 South Colonnade.