SFA PROJECT EXPERIENCE · 2025

2 Trafalgar Way, Canary Wharf
Façade water testing

High-level façade water testing carried out by Sky Facade Access Ltd under subcontract on a Canary Wharf façade package.

Façade water testing equipment at 2 Trafalgar Way, Canary Wharf
Water-testing equipment at 2 Trafalgar Way, Canary Wharf.

Project

Location: Canary Wharf, London
Year: 2025
SFA role: Specialist subcontract delivery
Scope: High-level façade water testing

The task

The work involved carrying out water testing at difficult-to-access façade locations as part of an agreed project scope.

The purpose of the work was to provide controlled test evidence at the relevant façade interfaces rather than assume the source of any water path from internal symptoms alone.

What the work required

High-level water testing needs the test area, sequence and observation method to be understood before water is introduced.

The work required controlled access to the agreed locations, management of the test equipment and coordination with the project team so that observations could be related to the area being tested.

SFA involvement

Sky Facade Access Ltd carried out the agreed specialist work under subcontract.

SFA’s involvement was limited to the instructed package and should not be read as responsibility for the wider façade design, engineering assessment or complete project delivery.

Evidence

Project records and SFA invoicing evidence support SFA’s involvement in the work shown here.

The photograph records the project context and testing equipment used for this package.

Have a similar water-ingress or façade-testing requirement?

Discuss the scope

View all projects